The machine-building enterprise is implementing a project for the technical re-equipment of production. Development of an investment project for the technical re-equipment of OK-Loza OJSC

Today, the average age of equipment at Russian machine-building enterprises is more than 20 years, the share of equipment older than 20 years exceeds 40% (Rosstat data for 2008).

It is obvious that there is an urgent need for the modernization of fixed assets, the implementation of which is hampered by the existing problems of the industry: the steady aging and deterioration of the quality of engineering and production personnel, an outdated educational base, an insufficient level of innovative development of Russian mechanical engineering and others.

The result of numerous examples of implemented technical re-equipment programs is new, but inefficiently operating equipment that does not significantly increase profits.

Thus, what is needed is not just modernization, but effective modernization, which increases the profitability of machine-building enterprises and increases the level of innovativeness of products and their consumer properties.

POSSIBLE EFFECTS WHEN MODERNIZING RUSSIAN MACHINERY ENTERPRISES

Speaking about the modernization of machine-building enterprises, it is interesting, first of all, to find out what might change during its implementation? What opportunities do Russian machine-building enterprises now have in this regard?

To answer this question, it is necessary to take into account that effective modernization implies not just the replacement of technological equipment, but also a change in the principles and approaches in the organization and management of production.

Thus, the potential effects of modernization can be divided into two components:

Effects of replacing technological equipment,

Effects of changing principles and approaches in the organization and management of production.

Effects of replacing process equipment

The replacement of technological equipment at machine-building enterprises is primarily carried out with the aim of reducing the production time of parts, saving costs on raw materials and electricity, freeing up personnel and production space.

The results of the projects and analytical work carried out allow the authors of the article to assert that the potential effects for machine-building enterprises with an outdated fleet of equipment (more than 20 years old) have the following values ​​(see figure).


Effects of changing principles and approaches in organizing and managing production

Replacing equipment with a more productive one in itself will not give tangible effects, since the production time of individual parts is a small part of the production cycle. To achieve tangible effects, modernization must be accompanied by the introduction of modern principles and approaches in the organization and management of production. It is necessary to use methods of fast-response production, theory of constraints, synchronized production, Toyota Production System methodology and others.

The effects of using these methods depend on the specifics of the enterprise and the state of its production system. It is difficult to express them quantitatively and bring them to an average. We can only say that in most cases they exceed the effects of simply replacing equipment, since they affect the enterprise as a whole.

According to the authors and other Russian and foreign experts, any modernization of machine-building enterprises must combine the effective replacement of old equipment with the introduction of modern principles and approaches in the organization and management of production.

WHAT IS INTERFERING?

The planned significant effects from modernization of production in practice are often more modest in nature (the authors even know of cases when the results of modernization were worse than when working on old equipment).

What are the main difficulties that Russian machine-building enterprises experience when carrying out modernization?

One of the main ones, according to the authors, is the provision of qualified personnel when implementing modernization projects. The reason for the lack of effectiveness of many projects is a lack of resources: the enterprise personnel are not strong enough to effectively update the equipment fleet. As a result, modernization is carried out over an extended period of time, which reduces the effect of its implementation.

Also, sometimes our own specialists may not keep up with new technological solutions, modern principles and approaches in organizing and managing production. In this regard, there is a risk of choosing outdated and less efficient technological equipment, as well as methods for organizing modernized production.

Another of the main difficulties of modernization is the ineffective budgeting system of some machine-building enterprises. This mainly applies to large state holdings. Quite often nowadays, the task of subsidiaries and organizational units to spend the money allocated to them before the end of the budget period is mandatory. This dominance of calendar deadlines over real needs significantly reduces the efficiency of expenses. Technical specifications for the purchase of technological equipment are not worked out in detail and are focused on budget development; purchases of equipment and tools are carried out “for future use” (“What if there is no money later?”). Ultimately, this leads to budget overruns due to purchases that do not reflect real needs.

WHAT TO DO?

To carry out effective modernization, enterprises need to pay special attention to training human resources to implement modernization projects. These should be highly professional specialists who “keep their finger on the pulse” of new technological solutions, modern principles and approaches in organizing and managing production. If it is inappropriate to maintain such a staff - with a small number of modernization projects - or provided that your own human resources are sometimes insufficient, it would be advisable to attract independent professional companies that can assist in the implementation of equipment fleet renewal projects.

Involving such companies for express analysis of technical re-equipment programs (as a technological auditor) will also have a positive effect, as it will allow you to obtain an independent opinion on the effectiveness of the solutions being developed. This will minimize the risks of choosing the wrong equipment.

Here it would be appropriate to draw an analogy with conducting regular accounting audits of organizations, the purpose of which is to provide objective financial information to management. Auditors check the accuracy of accounting and identify tax risks. It is not clear why, in most cases, machine-building enterprises do not spend funds on carrying out Making the wrong decision when forming the composition of production assets can lead to significantly greater monetary losses than tax payments!

As for the problems of the budgeting system, it seems appropriate to apply the principles of budget formation focused on achieving the final result, as well as increasing the horizons of budget planning.

At the industry level, it is important to create a specialized association that unites companies that conduct independent technological audits and implement modernization projects. At the same time, it is important to pay attention to the interaction of such an association with government bodies to provide assistance in the implementation of government programs aimed at the development of Russian mechanical engineering.

One of the proposed joint programs of the association and the state in terms of industry development may be a program for the creation and implementation of industry standards developed taking into account the best world experience and practices, including requirements for the production system of both state and commercial engineering enterprises. Another very popular program could be the creation of a center specializing in training personnel who carry out modernization and conduct technological audits (the authors know examples of similar industry programs abroad that were implemented due to the urgent need to reduce the cost of production of industrial enterprises and stimulate industry development).

In custody We would like to draw the attention of the management of Russian machine-building enterprises to the fact that sometimes modernization may not bring the desired effect due to the previously stated reasons.

In some cases, it will be advisable to involve independent professional companies in modernization projects and conduct technological audits of developed technical re-equipment programs. Sometimes it is difficult to notice a speck in your eye, and it is better to attract a person (and in some cases, a doctor) who can look from the outside, give his opinion and help.

Machine tool industry

The market for machine tool products in Russia last year amounted to 98.2 billion rubles.
According to the Federal State Statistics Service, industry enterprises in 2015 were able to maintain positive dynamics and increase the share of domestic products in the domestic market (from 13% before 22% ) .
In physical terms, the growth in production of metalworking equipment amounted to 5,3 % (With 5 756 before 6 059 PC.). At the same time, due to structural changes in product output towards increasing the production of more knowledge-intensive, high-tech equipment, the production of machine tools with numerical control has increased. The growth was about 60% (With 347 before 542 PC.).
According to the enterprises of the “Machine Tools” association, the output of machine tools amounted to 1873 PC. or 172,8% to the level of 2014.
Some enterprises of the Association showed more than 2-fold growth compared to 2014 (ZAO Stankotekh, Kolomna - 273% , LLC NPO "Stankostroenie" Sterlitamak - 243% ).
In 2015, state support was provided to the following machine tool enterprises:

  • OJSC "Tyazhmekhpress" - RUB 3,496,120.26; JSC "ZAREM" - RUB 3,863,609.80; PJSC "Siblitmash" - RUB 2,563,758.92; STAN Group LLC - RUB 17,148,241.33;
  • The Industrial Development Fund supported 4 projects in the machine tool industry with a total volume of RUB 1.4 billion(JSC Interskol-Alabuga, LLC Virial, OJSC Tyazhpressmash, LLC NPO Stankostroenie).
It should also be noted that one of the significant events for the industry was the formation of a large private player in the machine tool market - the STAN company, which primarily included the assets of the largest domestic enterprises, including the heavy machine tool industry: Ivanovo Heavy Machine Tool Plant LLC (Ivanovo Heavy Machine Tool Plant) Ivanovo), JSC Stankotech / CJSC KZTS (Kolomna), LLC Ryazan Machine Tool Plant (Ryazan), LLC NPO Stankostroenie (Sterlitamak), as well as LLC Grinding Machines (Ryazan) . Moscow).
The STAN company is aimed at developing competencies as a leading supplier of comprehensive solutions for the implementation of technological re-equipment projects for enterprises of the military-industrial complex, a company that ensures the creation of an effective system of after-sales support and maintenance of machine tool products, as well as a developer of prototypes of technological equipment for processing new generation materials .
So, in particular, the STAN company launched a product line of high-precision three- to five-axis multifunctional machining centers at NPO Stankostroenie (Sterlitamak).
In addition, negotiations are currently underway on the acquisition of the assets of one of the largest machine-tool enterprises in Russia for the design and production of high-tech machine tools for the aerospace complex - Savyolovsky Machine-Building Plant LLC (SMZ).
Also, a significant amount of development of new equipment is carried out at SASTA OJSC. Recently, the production of a turning center SA1100S50F4P with two pass-through supports for processing shafts up to 5 meters, turning center CAT400S06F03 with two supports for high-performance processing of parts with a diameter of up to 535 mm, a lathe with an operational control system SA500S10F2K, etc.
New types of equipment are being put into production at other machine-tool enterprises in Russia. At JSC "Stan-Samara" - a precision coordinate boring machine SKR 400, at the Machine Tool Plant "TBS" - a CNC lathe model PK514F3, at VSZ "Tekhnika" - a precision 2-spindle cylindrical grinding machine KSh-600.4, at MSZ " Salute" - high-precision CNC thread grinding machine mod. MSh5203.
JSC Siblitmash, Novosibirsk, has mastered the production of new injection molding machines.
OJSC Tyazhpressmash has mastered new hot stamping lines, which were manufactured and supplied to China and Korea.
OJSC "Altai Press" has prepared production for the manufacture of automatic complexes using the cold extrusion method based on force presses 2500 kN - 25,000 kN. At the same time, in order to stimulate the transfer of modern metalworking technologies, it is envisaged to use the mechanism of a special investment contract as part of the implementation of the Federal Law “On Industrial Policy”. This mechanism creates the necessary conditions for attracting and supporting foreign investors implementing joint projects to create production of machine-tool products on the territory of the Russian Federation under the terms of a schedule for phased deep localization of production in the medium term (3-5 years).
Foreign investors are already actively showing interest in this instrument. Thus, one of the projects planned for implementation within the framework of a special investment contract is a joint venture between the Ulyanovsk Machine Tool Plant and the German-Japanese concern DMG MORI SEIKI; the project provides for the production of a wide range of turning and milling machining centers with a design capacity of over 2017 1000 machines per year. The project provides for the creation of an engineering center for personnel training, as well as the development of new models of metal-cutting equipment in Russia.
Also, the project of MTE Kovosvit Mas LLC provides for the creation by 2018 of a modern high-tech production of metal-working machines of the turning and milling groups, as well as multifunctional metal-working centers of the Kovosvit company (Czech Republic). The plant area will be 33 thousand sq. m.
The Kovrov Electromechanical Plant, together with the Japanese manufacturer TAKISAWA, is localizing the production of a line of new generation turning and milling machining centers.
UMK Pumori LLC (Sverdlovsk region), in cooperation with the Japanese Okuma corporation, is planning in the near future joint production of machines under the Okuma-Pumori brand with subsequent localization of production, including in the form of a special investment contract.
One of the effective measures to promote import substitution and the development of domestic machine tool enterprises is the Decree of the Government of the Russian Federation dated December 24, 2013 No. 1224 “On establishing a ban and restrictions on the admission of goods originating from foreign countries, works (services) performed (rendered) by foreign persons for the purpose of purchasing goods, works (services) for the needs of national defense and state security” (hereinafter referred to as Resolution No. 1224).
Resolution No. 1224 establishes a ban on the purchase of imported technological equipment by machine-building enterprises in the presence of domestic analogues, which is established as a result of the relevant examination carried out by the commission of the Ministry of Industry and Trade of Russia. As part of the work of the commission of the Ministry of Industry and Trade of Russia for 12 months of 2015, 2513 applications that 37% lower than the number of applications submitted for the same period in 2014 ( 3961 statement). The decline in dynamics is due, among other things, to the import substitution policy pursued by the Russian Ministry of Industry and Trade in the field of machine tool industry and other incentive measures.

Heavy engineering

At the end of 2015, the volume of the heavy engineering market was RUB 235.5 billion or 114% by 2014. Domestic production in the industry increased by 29% and reached 115.5 billion rubles.
In physical terms, the volume of output for the main types of products in 2015 was:

  • steelmaking equipment and foundry machines - 27.2 thousand tons. (158,4% by 2014);
  • rental equipment - 456 t. (85,1% by 2014);
  • continuous lifts and conveyors for underground work - 315 pcs. (68,9% by 2014);
  • electric overhead cranes - 1690 pcs. (71,3% by 2014).
The average number of workers and the average monthly salary at the main enterprises in the industry were 181 thousand Human ( 99,5% by 2014) and 30 thousand rubles. (103,4% by 2014) respectively.
To support the production of domestic heavy engineering products, criteria for classifying industrial products as industrial products that have no analogues, produced in the Russian Federation, including overhead cranes, tower cranes, portal cranes, and mills, were developed and approved by Decree of the Government of the Russian Federation of July 17, 2015 No. 719 , presses, vacuum compression furnaces, passenger elevators.
In 2015, heavy engineering enterprises were provided with state support:
As part of Resolution No. 1312 to subsidize the costs of R&D in priority areas of civil industry as part of the implementation of complex investment projects, the Ministry of Industry and Trade of Russia in 2015 supported investment projects in 5 technological areas for a total amount 160 million rub., including Yurginsky Machine-Building Plant LLC (“Mining combines” and “Mobile mine support with hydraulic drive”), Sukholozhsky Crane Plant LLC (“Portal crane”), Shcherbinsky Elevator Plant LLC (“Winch”) , JSC "Kopeysk Machine-Building Plant" in the direction of "Tuning Machines".
As part of Resolution No. 3 on providing subsidies from the federal budget to Russian organizations to compensate for part of the costs of paying interest on loans received from Russian credit institutions in 2014–2016 for the implementation of new comprehensive investment projects, the project of Uralmashzavod OJSC was supported, which received a subsidy in the amount of 8 million rubles. and the project of Kopeysk Machine-Building Plant JSC in the amount 21 million rub.
As part of Government Decree No. 214 in 2015, 5 enterprises in the heavy engineering industry received support in the amount of RUB 172.1 million(JSC Kopeisk Machine-Building Plant, JSC Machine-Building Concern ORMETO-YUMZ, JSC TYAZHMASH, JSC EZTM, JSC Izhora Plants).
Heavy
mechanical engineering
Energy
mechanical engineering
Electrotechnical
industry
Cable
industry
Oil and gas
mechanical engineering
2014 2015 2014 2015 2014 2015 2014 2015 2014 2015
Volume of the Russian market, billion rubles. 205 235,5 123,3 117,2 148 137 235,56 236,3 450 476
Volume of domestic production, billion rubles. 82 115,5 88,2 92,8 102 98 177,9 204,4 193,5 214,2
Export volume, billion rubles. 9 14 12,8 20,8 18 19 15,6 21,7 17 20
Share of exports in production, % 10,98 12,12 14,5 22,4 17,6 19,4 8,7 10,6 8,8 9,3

Power engineering and cable industry

According to preliminary estimates, the volume of the power engineering market in 2015 was RUB 117.2 billion, which is lower than the level of 2014 by 4,95% , the volume of the electrical industry market in 2015 compared to the previous year decreased by 7,43% and compiled RUB 137 billion, and the cable industry increased by 1% RUB 236.3 billion At the same time, according to the Federal State Statistics Service, the volume of domestic production in 2015 compared to the previous year in the power engineering industry increased by 5,2% , cable industry - on 14,9% . At the same time, the volume of exports in the power engineering industry increased by 62,5% , in the electrical industry - on 5,56% .

  • As part of the Eastern Economic Forum, the state corporation “Bank for Development and Foreign Economic Affairs (Vnesheconombank)” and OJSC “Power Machines” entered into an agreement on the joint implementation of export projects and programs in the countries of the Asia-Pacific region (APR). The document is aimed at strengthening the competitiveness of the Russian economy, increasing its diversification, and ensuring access of Russian companies and the goods and services they produce to the world market.
  • OJSC Power Machines entered into agreements with the Directorate for the Unified Order of Equipment for Nuclear Power Plants (JSC DEZ, part of the Rosatom State Corporation) for the supply of complete equipment for turbine units at 122 billion rubles., the manufacturer will design, manufacture and supply six sets of turbine room equipment for three nuclear power plants - Bushehr (Iran), Kudankulam (India), Kursk NPP - 2 (Russia). The equipment for Kursk NPP-2 will include low-speed steam turbines (the plant’s own development); high-speed steam turbines will be installed at the other two stations. The development of a low-speed turbine unit will allow Power Machines to enter the market of low-speed high-power turbines.
  • OJSC Power Machines manufactured and completed shipment of a hydrogenerator with a capacity of 80 MW, manufactured for the Nizhne-Bureyskaya hydroelectric power station under construction.
  • At JSC "Optical Fiber Systems" (Saransk), with the participation of Deputy Chairman of the Government of the Russian Federation A. Dvorkovich, the launch of the 1st stage of the plant for the production of optical fiber took place ( 2.4 million km. per year) for the production of fiber optic cable. The creation of such an industrial production, practically the first in Russia, will make it possible to reduce the dependence of cable factories on imported optical fiber and expand the range of modern types of fiber-optic cables.
  • In the field of renewable energy sources, over 45 MW installed capacity of generating facilities with a high level of localization – 70% : Sakmara solar photovoltaic station. A.A. Vlazneva - 25 MW; Buribayevskaya solar power plant - 10 MW; Bugulchanskaya solar power plant - 5 MW; Kosh-Agach solar power plant-2 - 5 MW; Novokarachaevskaya Small Hydroelectric Power Station – 1.2 MW.
  • For the first time, high-speed controlled reactors of domestic production (manufactured by Aidis LLC) were put into commercial operation at a voltage substation 220 kV"Svetlaya" of intersystem electrical systems (IES) of Siberia.
  • In 2015, CJSC ZETO (Velikiye Luki) began implementing a large-scale project for the development and production of SF6 equipment. It is planned to develop industrial production of the following SF6 equipment: GIS - 110 kV; tank switches 110 kV; column switches 220 kV; current transformers 220 , 330 And 500 kV; voltage transformers 220 kV.
In 2015, enterprises in the power engineering, electrical and cable industries were provided with state support:
  • As part of Resolution No. 1312 on subsidizing part of R&D costs in priority areas of civil industry as part of the implementation of complex investment projects, the Ministry of Industry and Trade of Russia in 2015 supported investment projects in 6 technological areas for a total amount RUB 1,126.8 million(of which issued RUB 595.8 million) for the creation of technologies: including CJSC "ChEAZ" (air circuit breakers), OJSC "Kirs-kabel" (cable for voltage up to 550 kV), JSC "Zvezda-Energetika" (block-modular power plants from 1 MW), "InEnergy" (system of constant and backup power supply up to 100 kW), LLC "IC "Gas Turbine Technologies" (gas turbine engine 110 MW), JSC "VTI" (all-mode combined cycle gas plant with a capacity 20 25 MW).
  • As part of Resolution No. 3 on the provision of subsidies from the federal budget to Russian organizations to compensate for part of the costs of paying interest on loans received from Russian credit institutions in 2014-2016 for the implementation of new comprehensive investment projects, the project of Chechenneftekhimprom OJSC (energy conservation system) was supported (ESS) power 30 MWh per year), to whom a subsidy in the amount of RUB 97.378 million
  • As part of Resolution No. 214, in 2015, 18 enterprises of the power engineering, electrical and cable industries (7 enterprises of power engineering, 9 cable plants, 2 enterprises of the electrical industry) received RUB 322.7 million to compensate for the costs of paying interest on loans to replenish working capital.
  • Oil and gas engineering

    • According to preliminary estimates, the volume of the oil and gas equipment market in 2015 was 476 billion rubles., which is higher than the level of 2014 by 5,7% .
    • According to data from the Federal State Statistics Service, the volume of domestic production increased by 10,7% , the volume of exports of oil and gas equipment increased by 17,65% .
    • In 2015, three meetings of the Interdepartmental Working Group on reducing the dependence of the Russian fuel and energy complex on equipment imports, as well as on the development of oil and gas engineering in the Russian Federation (March 24, July 3 and November 23) were held. On June 19, 2015, at the St. Petersburg International Economic Forum, the Minister of Industry and Trade of Russia D.V. Manturov and Chairman of the Management Board of OJSC Gazprom A.B. Miller signed the Program for Import Substitution of Industrial Products used for the needs of PJSC Gazprom, its subsidiaries and dependent companies. This program was developed in order to concentrate the company’s investment resources on the development of strategic industries, minimize the impact of unfavorable foreign economic and foreign policy conditions on the domestic mechanical engineering industry, as well as synchronize the investment program of PJSC Gazprom with the capabilities of Russian manufacturers.
    • On October 26, 2015, a memorandum of understanding was signed between the Ministry of Industry and Trade of the Russian Federation and PJSC Gazprom for implementation on the basis of OJSC Tomsk Electromechanical Plant named after. V.V. Vakhrushev" investment project using the mechanism of a special investment contract to organize serial production of domestic anti-surge and control valves and electric drives for them. Also on November 23, 2015, at a meeting of the Interdepartmental Working Group in Ufa, Bashkortostan, a memorandum of intent was signed to conclude a special investment contract between Gazprom Neft PJSC, the GMS group, the Oryol region and the Russian Ministry of Industry and Trade for the localization of the production of import-substituting pumps for oil refining (including Apollo pumps according to API standards), as well as high-power pumps for the transport of oil/petroleum products.
    • In 2015, the Russian Ministry of Industry and Trade prepared proposals for adjusting the state program “Development of shipbuilding and equipment for the development of offshore fields for 2016-2030”, within the framework of which in 2016-2017 it is planned to support R&D in 6 offshore areas related to seismic exploration and underwater wellhead equipment, in the amount 1.35 billion rubles.
    • On June 25, a new multi-product research and production complex was launched on the territory of PJSC Cryogenmash. As part of the modernization program, the latest equipment has been installed and mastered: roll forming, welding, forging, rolling, shot blasting, metal cutting, painting, robotic complexes, an automated line for preparing parts for welding, etc.
    In 2015, oil and gas engineering enterprises were provided with state support:
    • As part of Resolution No. 1312 to subsidize the costs of R&D in priority areas of civil industry as part of the implementation of complex investment projects, the Ministry of Industry and Trade of Russia in 2015 supported investment projects in 8 technological areas for a total amount RUB 285 million, including PJSC Cryogenmash (“LNG production plants”), LLC Tekon Membrane Technologies (“membrane plants”), LLC NPF Plant “Izmeron” (“well equipment”), LLC Bezhetsk Experimental Plant " and LLC "Kamyshin Drilling Tools Plant" in the direction of "Drilling Equipment".
    • As part of Resolution No. 3 on providing subsidies from the federal budget to Russian organizations to compensate for part of the costs of paying interest on loans received from Russian credit institutions in 2014–2016, the project of Cryogenmash OJSC (OMZ PJSC) was supported for the implementation of new comprehensive investment projects. , who received a subsidy in the amount 42.282 million rubles.
    • As part of Government Decree No. 214, in 2015, 8 oil and gas engineering enterprises received RUB 312.8 million to compensate for the costs of paying interest on loans to replenish working capital (Novomet-Perm JSC, Kazankompressormash OJSC, Volgogradneftemash OJSC, Blagoveshchensk Valve Plant PJSC, Pervomaiskhimmash OJSC, Dmitrovogradkhimmash OJSC, Izhora OJSC factories", LLC "Corporation Uraltekhnostroy").
    • In 2015, the Industrial Development Fund reviewed applications for 31 projects from 29 enterprises and approved 6 projects, highlighting RUB 1.8 billion(FPC Cosmos-Neft-Gas LLC, Giprogazoochistka JSC (GGO), Tyazhpressmash JSC, HMS Livgidromash JSC, Concern Central Research Institute Elektropribor JSC, NPO Regulator JSC) for their implementation.
      The Ministry of Industry and Trade of Russia received information from oil and gas engineering enterprises about their intentions to submit applications in 2016 from the companies LLC NPP BURINTEKH, Ruselprom, NPF Baltic Manufactura, LLC ZERS, OJSC Volgogradneftemash, OJSC Kazankom-pressormash, Uralmash NGO Holding LLC.

    Send your good work in the knowledge base is simple. Use the form below

    Students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.

    Similar documents

      Essence and feasibility study of the investment project. Costs required to start production. Evaluating the effectiveness of the proposed investment project. Calculation of break-even point. Discounted payback period of investments.

      course work, added 11/24/2014

      Calculation of economic indicators of an investment project for organizing production for the production of parts. Property tax assessment. Loan repayment structure. Cash flow indicators. Financial profile of the project, break-even point.

      course work, added 12/17/2014

      Feasibility study, analysis and calculation of indicators of the created investment project: assessment of costs and efficiency, taking into account risk factors and uncertainty; determination of the payback period. The difference between a feasibility study and an investment memorandum.

      abstract, added 11/27/2010

      Business planning as a way to develop a feasibility study for an investment project. Economic characteristics of the experience of a functioning similar enterprise to create a new one. Calculation of the main economic indicators of the business plan.

      thesis, added 03/15/2014

      Marketing research of the hair dryer market in the Republic of Belarus. Determination of technical and economic indicators of the operation of an enterprise (shop). Calculation of capital investments (investments) in fixed production assets. Technical and economic indicators of the project.

      course work, added 04/13/2012

      Calculation of "critical points" when analyzing an investment project. Break-even analysis in project analysis. Analysis of the effectiveness of the implementation of an investment project at an enterprise. Indicators of commercial activity. Project performance indicators.

      course work, added 05/15/2010

      Calculation methods to justify an investment project. Determination of the most attractive investment project based on net present value. Determination of the profitability index and payback period of the project, assessment of its sustainability.

      course work, added 03/21/2013

      The essence of investing in real estate. Analysis of the dynamics of the main technical and economic indicators of the enterprise. Formation of the main provisions of the investment project. Calculation of the economic efficiency of an investment project.

      thesis, added 11/19/2014

    Technical re-equipment of an enterprise is one of the urgent tasks that companies in the mechanical engineering sector face today. And the main thing here is to find a professional, experienced contractor who can give not only a comprehensive assessment of the state of production, but also offer modern solutions that increase its efficiency. One of the latest such projects was implemented by Pumori-engineering invest, a company specializing in comprehensive technical re-equipment. The customer is a machine-building enterprise where it is necessary to modernize one of the machine shops to ensure efficient production of a given range of products.

    BASED ON TECHNICAL AUDIT

    The work began with a technological audit of existing production. Specialists from the technical service of Pumori-Engineering Invest conducted an examination, paying attention to the technologies and equipment used at the enterprise, the production planning and management system, product quality control, etc.

    At the same time, design and technological documentation for manufactured parts and assembly units (ADU) were studied. The customer presented drawings of about one and a half thousand DSE of various types and categories of complexity. For their production, the company uses modern and already outdated equipment of the following types: turning, milling, turning-milling, cylindrical grinding, surface grinding and electrical discharge. Based on the results of the technical audit, a concept for modernizing production, primarily in the technological field, was formed.

    Illustration of the technological layout of the modernized workshop

    (other production is located in the vacant areas)

    NON-STANDARD APPROACH

    The second stage of technical re-equipment is the development of promising technologies for processing parts, selection of modern high-performance equipment, calculation of its quantity, development of technological layout of the workshop and calculation of economic indicators of the project.

    When working with a large number of DFUs, the standard approach is considered to be one in which individual DFUs are combined into groups according to design and technological characteristics. In each group, a representative part is highlighted. For its production, a transitional technological process with the necessary equipment is developed and labor intensity is regulated. For the remaining parts of the group, so-called reduction coefficients are assigned - their use makes it possible to give a fairly accurate assessment of the labor intensity of manufacturing each part.

    However, the complexity of this project was that due to the diversity in the design of parts, materials used, accuracy and other parameters, using a standard approach would have to form a huge number of groups with a relatively small number of parts in each. As a result, the time spent on developing the entire range of DSU would be significant, while the project duration is limited by the customer. Therefore, Pumori-engineering invest specialists have developed an improved methodology. It made it possible to combine parts into groups only by type of processing, and assign reduction coefficients based on the following parameters:

    • volume of machining;
    • type of workpiece;
    • precision and roughness;
    • presence of heat treatment, etc.;

    This approach significantly reduced the number of teams, which speeded up the project without compromising its quality.


    Illustration of the technological layout of the modernized workshop

    WORK FOR RESULTS

    Based on the developed technological processes and the calculated labor intensity, a list was generated, the required quantity was determined, taking into account the restrictions specified by the customer: annual working time, maximum load factor, interchangeability of machines. Technical requirements have been developed for the equipment, according to which specific machine models are recommended. The technological layout of the workshop was developed taking into account the results of analysis and optimization of material flows.

    Today, the customer of the project for technological modernization of production, together with Pumori-engineering invest, is implementing the proposed solutions. It is planned that by the end of 2018 the project will be fully completed. Without waiting for the final stage, we can confidently state: the solutions proposed by the contracting company are already increasing production efficiency.


    Simulation of a workshop in a virtual environment

    Nikita Gaisin, Head of Engineering Projects Department

    Review of the current state of the bearing sub-industry of the Russian Federation. Products of the bearing sub-industry have their special significance and role in the country’s economy. Modernization of production and development of the bearing sub-industry. The complete elimination of finishing operations from the technological process, as well as a significant reduction in the volume of manual and adjustment operations, makes it possible to reduce the labor intensity of bearing manufacturing and, as a result, reduce personnel.


    Share your work on social networks

    If this work does not suit you, at the bottom of the page there is a list of similar works. You can also use the search button


    Other similar works that may interest you.vshm>

    17235. Development and economic justification of a project for the technical re-equipment of vehicles at the Mosavtosantrans Automotive Plant State Unitary Enterprise Avtobaza No. 3 4.6 MB
    Among the main areas for improving the maintenance and repair process, one can highlight increasing the level of automation and mechanization at maintenance posts, improving methods in repair management and diagnostics, as well as introducing quality management for fleet maintenance.
    3259. Feasibility study of an energy supply investment project 516.6 KB
    The development of a feasibility study for an investment project involves, first of all, ensuring high efficiency in the use of the resources available to the enterprise: achieving maximum economic results with minimal total costs of production and sales of its products.
    15085. Feasibility study of an investment project for an enterprise producing refrigerators 521.12 KB
    A refrigerator is a device that maintains a low temperature in a heat-insulated chamber. The operation of a refrigerator is based on the use of a refrigeration machine that transfers heat from the working chamber of the refrigerator to the outside, where it is dissipated into the external environment.
    15314. Justification of the effectiveness and feasibility of implementing an investment project for the production of a programmer 186.99 KB
    Investments are a necessary component and driving force for the effective functioning of a modern market economy. Investments are understood as economic resources aimed at increasing the real capital of society. The more complex the situation in the country, the more the investor’s experience and intuition should be based on the results of an expert assessment of the investment climate. The investment climate is a generalized characteristic of the totality of social
    5353. Proposals for the technical re-equipment of the enterprise by modernizing industrial refrigeration systems (using the example of Neftekamsk Truck Tire Plant LLC) 575.6 KB
    The information base for the work was data from Rosstat of the Russian Federation; actual data obtained during the enterprise survey; results of surveys, interviews with managers of enterprises, scientific organizations, and specialists.
    13156. Development of an investment project as a tool for increasing the efficiency of commercial activities of an enterprise 58.68 KB
    The use of financial leasing allows enterprises to carry out modernization and technical re-equipment using future revenues and income from the use of new equipment without significantly worsening their current financial condition. The goal of the work is to develop an investment project as a tool for increasing the efficiency of the enterprise’s commercial activities. In accordance with the purpose of the work, the following tasks are set to consider the theoretical aspects of investment financing; conduct an analysis of investment financing for...
    15575. Development and justification of the organizational project of an orphanage for mentally retarded children for one hundred places 1.66 MB
    The object of study of the final qualifying work is state budgetary social service institutions for disabled children. The subject of the study is the comprehensive design of a state budgetary social service institution for mentally retarded children. The purpose of this final qualifying work is to develop and substantiate the organizational project of an orphanage for mentally retarded children for one hundred places. In the process of researching the BSUSO Kirov orphanage for the mentally retarded...
    17659. Evaluating the effectiveness of an investment project 891.81 KB
    Stages of development of an investment project and its criteria. Evaluating the effectiveness of an investment project. For proper investment, it is important to evaluate the effectiveness of an investment project using criteria and evaluation methods that will justify the decision - to invest your funds in the project or leave it to increase your capital or protect yourself from an unprofitable investment.
    5947. Financial support for the investment project 16.56 KB
    The difficulty of choosing an investment strategy is associated with the search and evaluation of alternative investment solutions that best meet the goals of the enterprise and the prospects for its development. The most important element of the financial strategy of an enterprise is the strategy for the formation of investment resources of the enterprise, which should be based on the following principles: taking into account the prospects for the development of investment activity. ensuring compliance of the volume of attracted investment resources with the volume of investment needs of the enterprise. security...
    16054. Methodology for assessing the effectiveness of an investment project 863.06 KB
    An investor's investment of his own or borrowed money to achieve business goals related to generating profit is called investment. Project management is not a modern invention.


     


    Read:



    Production culture - what does this concept include?

    Production culture - what does this concept include?

    At first glance, it seems that the relationship between employees and the quality of the products are in no way connected, but in reality it turns out that...

    Nuclear power plant The city of the world's first nuclear power plant

    Nuclear power plant The city of the world's first nuclear power plant

    Nuclear power plant (NPP) is a power plant in which atomic (nuclear) energy is converted into electrical energy. Power generator at a nuclear power plant...

    Scientific and methodological foundations of product quality planning

    Scientific and methodological foundations of product quality planning

    Return to Product quality planning - adoption of justified assignments for its production with the required values ​​of quality indicators for...

    Using characteristics, series, properties and categories of objects

    Using characteristics, series, properties and categories of objects

    I'm new to learning Python and some of its libraries (numpy, pandas). I found a lot of documentation on how nudist ndarrays work, series...

    feed-image RSS